Grove Hill (Ala.) Memorial Hospital is adding a new $3.75 million, 4,500-sf emergency department that will house nine exam and treatment rooms, a two-bay trauma room, expanded waiting area, and direct access to operating rooms within the hospital.
During several months of construction that started last November, Grove Hill couldn’t shut down its existing ED because it’s the only one serving Clark County. And the hospital’s administration determined that converting unutilized space into a temporary ED would be too costly.
The project’s architect, Paul Fridl of Goodwyn, Mills and Cawood, suggested an economical alternative: a mobile ED. The hospital contacted Carolina HealthCare Systems, whose Carolinas MED-1 unit for more than a decade has provided temporary patient care after natural disasters or when a hospital’s infrastructure breaks down.
MED-1 travels as two 53-foot tractor trailers. It is completely self-sustaining for the first 72 hours, using generators or local shore power.
The mobile unit comprises a 1,000-sf patient care component that is equipped and staffed to manage minor to severe emergency medical conditions; six critical-care beds with built-in cardiac monitors; full trauma surgery and anesthesia capabilities; ED acute care beds; and a dental/EENT chair. Other medical equipment—like X-ray, ultrasound, I-stat laboratory, and IV pumps—are available.
Grove Hill would prove to be MED-1’s longest stint: more than seven months. This was also the first time the mobile unit would be set up as a “permanent temporary” ED, says Brian Hale, Senior Project Manager with Robins & Morton, the GC and construction manager on the project.
Robins & Morton built a lighted, fire-sprinkler-equipped vestibule, with fire and smoke detectors, to connect the mobile unit to the existing hospital. It hooked MED-1 up to the hospital’s water supply, and replaced the ramps.
This had never been done before in Alabama, and “there were no applicable codes,” says Hale. It required creative problem-solving to overcome issues like how to wire MED-1 to the local power grid.
Read about more innovations from BD+C's 2016 Great Solutions Report
Related Stories
Architects | May 2, 2024
Emerging considerations in inclusive design
Design elements that consider a diverse population of users make lives better. When it comes to wayfinding, some factors will remain consistent—including accessibility and legibility.
Healthcare Facilities | Apr 16, 2024
Mexico’s ‘premier private academic health center’ under design
The design and construction contract for what is envisioned to be “the premier private academic health center in Mexico and Latin America” was recently awarded to The Beck Group. The TecSalud Health Sciences Campus will be located at Tec De Monterrey’s flagship healthcare facility, Zambrano Hellion Hospital, in Monterrey, Mexico.
Healthcare Facilities | Apr 11, 2024
The just cause in behavioral health design: Make it right
NAC Architecture shares strategies for approaching behavioral health design collaboratively and thoughtfully, rather than simply applying a set of blanket rules.
Healthcare Facilities | Apr 3, 2024
Foster + Partners, CannonDesign unveil design for Mayo Clinic campus expansion
A redesign of the Mayo Clinic’s downtown campus in Rochester, Minn., centers around two new clinical high-rise buildings. The two nine-story structures will reach a height of 221 feet, with the potential to expand to 420 feet.
Products and Materials | Mar 31, 2024
Top building products for March 2024
BD+C Editors break down March's top 15 building products, from multifamily-focused electronic locks to recyclable plastic panels.
Healthcare Facilities | Mar 18, 2024
A modular construction solution to the mental healthcare crisis
Maria Ionescu, Senior Medical Planner, Stantec, shares a tested solution for the overburdened emergency department: Modular hub-and-spoke design.
Healthcare Facilities | Mar 17, 2024
5 criteria to optimize medical office design
Healthcare designers need to consider privacy, separate areas for practitioners, natural light, outdoor spaces, and thoughtful selection of materials for medical office buildings.
Healthcare Facilities | Mar 15, 2024
First comprehensive cancer hospital in Dubai to host specialized multidisciplinary care
Stantec was selected to lead the design team for the Hamdan Bin Rashid Cancer Hospital, Dubai’s first integrated, comprehensive cancer hospital. Named in honor of the late Sheikh Hamdan Bin Rashid Al Maktoum, the hospital is scheduled to open to patients in 2026.
Sports and Recreational Facilities | Mar 14, 2024
First-of-its-kind sports and rehabilitation clinic combines training gym and healing spa
Parker Performance Institute in Frisco, Texas, is billed as a first-of-its-kind sports and rehabilitation clinic where students, specialized clinicians, and chiropractic professionals apply neuroscience to physical rehabilitation.
Healthcare Facilities | Mar 7, 2024
A healthcare facility in New Jersey will be located at a transit station
The project is part of a larger objective to make transportation hubs more multipurpose.