Tactical issues for renovating university research buildings

Laboratories

Tactical issues for renovating university research buildings

It may not always be the answer, but a smart renovation of an existing research building can create more efficient, productive, connected, and future-oriented research spaces.


By Matthew Plecity, AIA, ASLA | GBBN | January 25, 2024
Student engineer Assembling Robotic Arm with computer in Technology Workshop. Service Engineer Holding Robot Controller and Checking Robotic Arm Welding Hardware.
Student engineer Assembling Robotic Arm with computer in Technology Workshop. Service Engineer Holding Robot Controller and Checking Robotic Arm Welding Hardware.

It is an underappreciated fact that scientific work is closely connected to the built environment in which it’s done. As Henning Schmidgen of Bauhaus University puts it, “It is almost impossible to imagine science without laboratories. Our concept and image of modern science is fundamentally defined by special buildings in which experts utilize vast technical resources to investigate natural phenomena and processes.”

One easily imagines what Schmidgen calls the “iconography of the lab.” White-coated scientists sit before their microscopes, a syringe in hand. On black epoxy countertops before them sits a strangely configured assembly of vials, beakers, tubing, and Bunson burners. Glass-cased shelves hold assorted specimens in the background, and tubes carrying various gases hang from the ceiling. Workbench lights with articulated arms sit within reach, ready to shed their light on nature’s secrets.

But our cultural imagination is out of date—frozen somewhere between Mary Shelley’s Frankenstein and the early 20th Century. No doubt, test tubes, thermometers, petri dishes, and Vernier Calipers will remain critical instruments of many labs for the foreseeable future, but academic laboratories are changing.

Indeed, they have been for a long time. But with universities seeing increased demand for applied, interdisciplinary research and the influence of emerging technologies—artificial intelligence, automation, computer simulation, and intelligent laboratory instrument management systems—the rate of change is accelerating.

To Build (Anew), Or Not to Build?

This raises the question: If laboratory research is closely connected to a highly specialized, built environment, does a transformation in the way it’s conducted require us to build wholly new research buildings? And if so, what’s to become of the old?  

There are certainly times when a new building is appropriate. Most existing academic research buildings don’t enjoy large, column-free spaces. In the first half of the 20th Century when many university research spaces were built, the building assemblies that were being used didn’t make it easy to create large, column-free spaces. So, if the research you’re anticipating requires vast, unbroken spaces, you may need a new building. New buildings can better manage vibration, which can be very important to research outcomes. So, sometimes a new building is the answer, but not always.

Environmental & Financial Considerations

The decision of whether to build a new research building or renovate existing spaces also needs to be weighed within a larger context. Colleges and universities should ask how sustainable a new building is. In environmental terms, there is a tradeoff between preserving the embodied carbon of older buildings and the better energy performance that can be gained with new buildings (with better envelopes). But this question of sustainability also has a financial dimension.

The fact is that many universities are overbuilt. A 2021 report from the Association of Physical Plant Administrators (APPA) estimates that higher education is facing a deferred maintenance bill of approximately $121 billion. This is due in part to the building boom in the first decades of this century, when universities invested heavily in amenities that were intended to attract students. One study states that the amount of space per student had tripled from the 1970s to 2010.

This situation was exacerbated by the pandemic, which resulted in 2023 enrollment figures that were down 6% from 2019. It also promises to get worse as colleges face a “demographic cliff” in the pool of traditional, college-aged people. Beginning in 2025, there will be a 15% drop in the number of 18-year-olds in the United States. So, not only are colleges overbuilt, but much of the newer construction that has taken place on campus has focused on amenities that are serving a smaller number of students.

New Science, Old Buildings: Renovating University Research Buildings

Against this backdrop—and with renewed federal investment in university research—there are compelling reasons for universities who are considering investing in research facilities to invest in the renovation of facilities. Not only will such an investment extend the life of the carbon already embodied in the building, but it can also chip away at a daunting deferred maintenance backlog. It may not always be the answer, but a smart renovation of an existing research building can create more efficient, productive, connected, and future-oriented research spaces.

Having established the dilemma that universities face when considering the future of their research facilities, we will be publishing a series of articles that delve into specific, tactical issues to consider when reorienting your research spaces toward the future. Topics to be discussed will include strategies for rationalizing existing lab spaces, ways of prioritizing flexibility (especially for labs with rotating research teams), and ways to reconfigure research buildings to foster connectivity and multidisciplinary collaboration.

More from Author

GBBN | Feb 26, 2024

GBBN's Inflation Reduction Act Calculator goes live

GBBN has publicly released its IRA Calculator, a tool that helps you understand funding opportunities in the IRA for sustainable design.

GBBN | Dec 14, 2023

What's next for affordable housing in 2024?

As 2023 draws to a close, GBBN’s Mary Jo Minerich and Amanda Markovic, AIA sat down to talk about the future. What’s next in terms of trends, technology, and construction of affordable housing?

GBBN | Oct 11, 2023

Leveraging land and light to enhance patient care

GBBN interior designer Kristin Greeley shares insights from the firm's latest project: a cancer center in Santa Fe, N.M.

GBBN | Aug 31, 2023

Small town takes over big box

GBBN associate Claire Shafer, AIA, breaks down the firm's recreational adaptive reuse project for a small Indiana town.

GBBN | Jun 20, 2023

Designing arts spaces that curate inclusivity

GBBN's Julia Clements and Marcene Kinney, AIA, LEED AP, talk tips for designing inclusive arts spaces.

GBBN | Mar 22, 2023

Onsite prefabrication for healthcare construction: It's more than a process, it's a partnership

Prefabrication can help project teams navigate an uncertain market. GBBN's Mickey LeRoy, AIA, ACHA, LEED AP, explains the difference between onsite and offsite prefabrication methods for healthcare construction projects.

GBBN | Mar 8, 2023

Is Zoom zapping your zip? Here are two strategies to help creative teams do their best work

Collaborating virtually requires a person to filter out the periphery of their field of vision and focus on the glow of the screen. Zoom fatigue is a well-documented result of our over-reliance on one method of communication to work. We need time for focus work but working in isolation limits creative outcomes and innovations that come from in-person collaboration, write GBBN's Eric Puryear, AIA, and Mandy Woltjer.

GBBN | Jan 12, 2023

Invest in existing buildings for your university

According to Nick Sillies of GBBN, students are increasingly asking: "How sustainable is your institution?" Reusing existing buildings may help answer that.

GBBN | Dec 5, 2022

How to foster collaboration and inspiration for a workplace culture that does not exist (yet)

A building might not be able to “hack” innovation, but it can create the right conditions to foster connection and innovation, write GBBN's Chad Burke and Zachary Zettler.

GBBN | Oct 27, 2022

Who are you? Four archetypes shaping workspaces

The new lifestyle of work requires new thinking about the locations where people work, what their workflow looks like, and how they are performing their best work.

boombox1 - default
boombox2 -
native1 -

More In Category


Laboratories

HGA unveils plans to transform an abandoned rock quarry into a new research and innovation campus

In the coastal town of Manchester-by-the-Sea, Mass., an abandoned rock quarry will be transformed into a new research and innovation campus designed by HGA. The campus will reuse and upcycle the granite left onsite. The project for Cell Signaling Technology (CST), a life sciences technology company, will turn an environmentally depleted site into a net-zero laboratory campus, with building electrification and onsite renewables.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021