flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

DOE launches $2 million prize to advance cost-effective, energy-efficient commercial windows

Windows and Doors

DOE launches $2 million prize to advance cost-effective, energy-efficient commercial windows

The inaugural Building Envelope Innovation Prize targets novel solutions for commercial window upgrades to enable equitable decarbonization and optimize building envelopes for electrification.


By Peter Fabris, Contributing Editor | February 28, 2024
DOE launches $2 million prize to advance cost-effective, energy-efficient commercial windows
Illustration of an energy-efficient secondary glazing system being installed in a commercial building with minimal disruption. Graphic by Al Hicks, NREL

The U.S. Department of Energy launched the American-Made Building Envelope Innovation Prize—Secondary Glazing Systems. The program will offer up to $2 million to encourage production of high-performance, cost-effective commercial windows. 

The inaugural Building Envelope Innovation Prize targets novel solutions for commercial window upgrades to enable equitable decarbonization and optimize building envelopes for electrification, according to a DOE news release.

Secondary glazing involves installing an additional windowpane on an existing window to improve insulation.

“About 40% of U.S. commercial buildings, including multifamily residences, have single-pane windows, which are uncomfortable for occupants and waste energy,” says Jeff Marootian, principal deputy assistant secretary for energy efficiency and renewable energy. “Yet less than 1% of commercial buildings get full window replacements each year because it is so expensive and disruptive for occupants. Secondary glazing systems can help solve this problem.”

“While secondary glazing systems currently exist, they are a small portion of the market and are not widely adopted, despite costing markedly less than a full window replacement,” says Marc LaFrance, windows technology manager for DOE’s Building Technologies Office. “This prize will improve equitable access to efficient retrofit technologies by reducing product and installation costs.”

Here are more details from DOE: 
Secondary glazing systems currently on the market can improve energy efficiency without needing to remove existing windows, but the potential of this technology has not been fully realized. The goal of this prize is to spur development of next-generation secondary windows that increase building resilience and comfort and decrease energy consumption—all while being highly cost-effective.

Improved window energy efficiency will lead to more attainable building electrification, as smaller heat pumps will be able to serve the building’s reduced energy needs. The Building Envelope Innovation Prize aims to fund development of promising, cost-effective, market-ready secondary glazing system solutions across three phases:

Phase 1: Design Concept—$50,000 | February 14 to June 13, 2024

  • Teams will provide an innovative concept narrative and design drawings for a secondary glazing system prototype, including details on cost and energy performance.
  • Up to five semifinalists will be selected, each receiving $50,000.
  • Phase 1 awards will be based on energy and technical performance modeling, cost metrics, and construction plans.
  • Teams can only join during Phase 1

Phase 2: Prototype—$200,000 | September 2024 to March 2025

  • Semifinalist teams selected from Phase 1 will submit a secondary glazing system prototype and technical narrative as well as secure an equity-focused pilot demonstration partner.
  • Phase 2 focus areas will include market readiness, cost-effectiveness, and the ability to be deployed.
  • Up to three finalists will be selected, each receiving $200,000.
  • Phase 2 awards will be based on prototype construction, as well as thermal and optical performance tests run by a national laboratory.

Phase 3: Commercialization—$750,000 | May 2025 to May 2026

  • Finalist teams selected from Phase 2 will work with their equity-focused pilot demonstration partners and submit plans for commercialization. 
  • Phase 3 will focus on commercial viability—including price point, ease of installation, etc.
  • Up to two winners will be selected. First place will receive $750,000; second place will receive $400,000.
  • Phase 3 awards will be based on prototype durability testing results, rigor of commercialization plans, and implementation of equity-focused pilot demonstrations in low-income multifamily or underserved public sector buildings.

The Design Concept phase will accept applications of innovative secondary glazing system designs through June 13, 2024. All interested applicants must join by that date; Phase 2 and Phase 3 will not accept new competitors. 

Related Stories

University Buildings | May 10, 2024

UNC Chapel Hill’s new medical education building offers seminar rooms and midsize classrooms—and notably, no lecture halls

The University of North Carolina at Chapel Hill has unveiled a new medical education building, Roper Hall. Designed by The S/L/A/M Collaborative (SLAM) and Flad Architects, the UNC School of Medicine’s new building intends to train new generations of physicians through dynamic and active modes of learning.

MFPRO+ News | May 10, 2024

HUD strengthens flood protection rules for new and rebuilt residential buildings

The U.S. Department of Housing and Urban Development (HUD) issued more stringent flood protection requirements for new and rebuilt homes that are developed with, or financed with, federal funds. The rule strengthens standards by increasing elevations and flood-proofing requirements of new properties in areas at risk of flooding. 

Government Buildings | May 10, 2024

New federal buildings must be all-electric by 2030

A new Biden Administration rule bans the use of fossil fuels in new federal buildings beginning in 2030. The announcement came despite longstanding opposition to the rule by the natural gas industry. 

Mass Timber | May 8, 2024

Portland's Timberview VIII mass timber multifamily development will offer more than 100 affordable units

An eight-story, 72,000-sf mass timber apartment building in Portland, Ore., topped out this winter and will soon offer over 100 affordable units. The structure is the tallest affordable housing mass timber building and the first Type IV-C affordable housing building in the city. 

K-12 Schools | May 7, 2024

World's first K-12 school to achieve both LEED for Schools Platinum and WELL Platinum

A new K-12 school in Washington, D.C., is the first school in the world to achieve both LEED for Schools Platinum and WELL Platinum, according to its architect, Perkins Eastman. The John Lewis Elementary School is also the first school in the District of Columbia designed to achieve net-zero energy (NZE). 

Healthcare Facilities | May 6, 2024

Hospital construction costs for 2024

Data from Gordian breaks down the average cost per square foot for a three-story hospital across 10 U.S. cities.

MFPRO+ Special Reports | May 6, 2024

Top 10 trends in affordable housing

Among affordable housing developers today, there’s one commonality tying projects together: uncertainty. AEC firms share their latest insights and philosophies on the future of affordable housing in BD+C's 2023 Multifamily Annual Report.

Retail Centers | May 3, 2024

Outside Las Vegas, two unused office buildings will be turned into an open-air retail development

In Henderson, Nev., a city roughly 15 miles southeast of Las Vegas, 100,000 sf of unused office space will be turned into an open-air retail development called The Cliff. The $30 million adaptive reuse development will convert the site’s two office buildings into a destination for retail stores, chef-driven restaurants, and community entertainment.

Codes and Standards | May 3, 2024

New York City considering bill to prevent building collapses

The New York City Council is considering a proposed law with the goal of preventing building collapses. The Billingsley Structural Integrity Act is a response to the collapse of 1915 Billingsley Terrace in the Bronx last December. 

Student Housing | May 3, 2024

Student housing construction dips in the first quarter of 2024

Investment in college dorms dipped slightly in the first quarter of 2024, but remains higher than a year ago.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021