flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Average age of U.S. school buildings is just under 50 years

K-12 Schools

Average age of U.S. school buildings is just under 50 years

About half of schools have never had a major renovation


By Peter Fabris, Contributing Editor  | February 29, 2024
Photo by Mary Taylor

Photo by Mary Taylor

The average age of a main instructional school building in the United States is 49 years, according to a survey by the National Center for Education Statistics (NCES)

About 38% of schools were built before 1970. Roughly half of the schools surveyed have undergone a major building renovation or addition. Of those that have been renovated, the average age of the renovation was 14 years.

Major repair, renovation, or modernization work was being performed in 21% of all public schools surveyed as of December 2023. Indoor air quality is a major focus for many schools, with 39% having an indoor air quality coordinator on campus. This position is responsible for monitoring air quality conditions at the school and reporting air quality issues and complaints.

Some 60% of schools have designated vehicle loading and unloading areas at least 25 feet from all building air intakes, including doors and windows. Eighteen % of schools have an anti-idling program that includes signage and active monitoring during pick-up and drop-off times.

Some 31% of public schools have one or more non-permanent (portable) buildings in use.

Here are other findings from the NCES public school building survey:

The average age of the main instructional building is 49 years old. The following %ages of reporting public schools’ main instructional buildings were built during the following time periods:

  • Pre-1970: 38%
  • 1970 – 1999: 21%
  • 2000 – present: 20%

Nearly all public schools (93%) reported having some kind of athletic amenities on-site. The most commonly reported types of facilities were:

  • A gymnasium (69%)
  • All-purpose grass field (68%)
  • Outdoor basketball court (56%)
  • Baseball/softball field (38%)
  • Weight room (29%)
  • Outdoor track (28%)

Most public schools have dedicated library space available (89%).

Compared to the national estimate (89%), higher percentages of public schools with the following characteristics reported having dedicated library space available:

  • With 500-999 students (96%)
  • With a student body made up of 0-25% students of color (96%)
  • In rural areas (94%)
  • With 300-499 students (93%)
  • Elementary schools (93%)
  • In low-poverty neighborhoods (92%)

Compared to the national estimate (89%), lower percentages of public schools with the following characteristics reported having dedicated library space available:

  • In cities (84%)
  • In high-poverty neighborhoods (81%)
  • With a student body made up of 76% or more students of color (80%)
  • High/secondary schools (80%)
  • With 0-299 students (77%)

Related Stories

K-12 Schools | May 7, 2024

World's first K-12 school to achieve both LEED for Schools Platinum and WELL Platinum

A new K-12 school in Washington, D.C., is the first school in the world to achieve both LEED for Schools Platinum and WELL Platinum, according to its architect, Perkins Eastman. The John Lewis Elementary School is also the first school in the District of Columbia designed to achieve net-zero energy (NZE). 

Biophilic Design | May 6, 2024

The benefits of biophilic design in the built environment

Biophilic design in the built environment supports the health and wellbeing of individuals, as they spend most of their time indoors.

K-12 Schools | Apr 30, 2024

Fully electric Oregon elementary school aims for resilience with microgrid design

The River Grove Elementary School in Oregon was designed for net-zero carbon and resiliency to seismic events, storms, and wildfire. The roughly 82,000-sf school in a Portland suburb will feature a microgrid—a small-scale power grid that operates independently from the area’s electric grid. 

K-12 Schools | Apr 29, 2024

Tomorrow's classrooms: Designing schools for the digital age

In a world where technology’s rapid pace has reshaped how we live, work, and communicate, it should be no surprise that it’s also changing the PreK-12 education landscape.

School Construction | Apr 22, 2024

A school district in Utah aggressively moves forward on modernizing its schools

Two new high schools manifest nuanced design differences.

Fire-Rated Products | Apr 16, 2024

SAFTI FIRST launches redesigned website

SAFTI FIRST, leading USA-manufacturer of advanced fire rated glass and framing systems, is pleased to announce the launch of its newly redesigned website, safeglassforschools.com.

K-12 Schools | Apr 11, 2024

Eric Dinges named CEO of PBK

Eric Dinges named CEO of PBK Architects, Houston.

K-12 Schools | Apr 10, 2024

A San Antonio school will provide early childhood education to a traditionally under-resourced region

In San Antonio, Pre-K 4 SA, which provides preschool for 3- and 4-year-olds, and HOLT Group, which owns industrial and other companies, recently broke ground on an early childhood education: the South Education Center.

K-12 Schools | Apr 10, 2024

Surprise, surprise: Students excel in modernized K-12 school buildings

Too many of the nation’s school districts are having to make it work with less-than-ideal educational facilities. But at what cost to student performance and staff satisfaction? 

K-12 Schools | Apr 1, 2024

High school includes YMCA to share facilities and connect with the broader community

In Omaha, Neb., a public high school and a YMCA come together in one facility, connecting the school with the broader community. The 285,000-sf Westview High School, programmed and designed by the team of Perkins&Will and architect of record BCDM Architects, has its own athletic facilities but shares a pool, weight room, and more with the 30,000-sf YMCA.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021