flexiblefullpage -
billboard - default
interstitial1 - interstitial
catfish1 - bottom
Currently Reading

Aston Martin breaks ground on new F1 headquarters

Sports and Recreational Facilities

Aston Martin breaks ground on new F1 headquarters

The project is located in Northamptonshire.


By David Malone, Managing Editor | September 15, 2021
Aston Martin campus aerial
Renderings courtesy Aston Martin Racing

The Aston Martin Cognizant Formula One Team has recently broken ground on a new headquarters in Northamptonshire, England. The project, which represents the first all-new F1 factory in the UK since the McLaren Technology Centre opened in 2004, is being designed by Ridge and Partners LLP.

The project will span 400,000 sf across multiple buildings, including a factory and a wind tunnel. The three-unit factory will be built just across the street from the Silverstone Grand Prix Circuit. One building will house the team’s design, manufacturing and marketing resource; a second building will be occupied by the new wind tunnel; and the third will redevelop and repurpose the existing factory premises as a central hub with staff amenities and a logistics center. The new headquarters will house every manufacturing resource within a single campus for the first time in Aston Martin’s history.

Aston Martin campus rendering

The new wind tunnel will use the latest steel-belt rolling-road system and a state-of-the-art flow-imaging section area. The site will incorporate the wind tunnel, model support, and production facilities. The commissioning of the wind tunnel is due to start in Q3 2023.

Aston Martin campus

The project also claims to be the first “smart factory” in Formula One. It has been designed from the ground-up to be a wireless, adaptive, streamlined facility with all of its information streams, monitoring systems, and manufacturing processes tied together via data in the cloud. The technology will give the headquarters the ability to constantly adapt to the cyclical manufacturing processes of a Formula One team.

The new headquarters is slated for completion in late 2022 or early 2023.

Aston Martin campus aerial

Aston martin F1 campus

 

 

 

 

Related Stories

Mixed-Use | Apr 9, 2024

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.

Cultural Facilities | Apr 8, 2024

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.

Sports and Recreational Facilities | Apr 2, 2024

How university rec centers are evolving to support wellbeing

In a LinkedIn Live, Recreation & Wellbeing’s Sadat Khan and Abby Diehl joined HOK architect Emily Ostertag to discuss the growing trend to design and program rec centers to support mental wellbeing and holistic health.

Sports and Recreational Facilities | Mar 14, 2024

First-of-its-kind sports and rehabilitation clinic combines training gym and healing spa

Parker Performance Institute in Frisco, Texas, is billed as a first-of-its-kind sports and rehabilitation clinic where students, specialized clinicians, and chiropractic professionals apply neuroscience to physical rehabilitation. 

Sports and Recreational Facilities | Mar 7, 2024

Bjarke Ingels’ design for the Oakland A’s new Las Vegas ballpark resembles ‘a spherical armadillo’

Designed by Bjarke Ingels Group (BIG) in collaboration with HNTB, the new ballpark for the Oakland Athletics Major League Baseball team will be located on the Las Vegas Strip and offer panoramic views of the city skyline. The 33,000-capacity covered, climate-controlled stadium will sit on nine acres on Las Vegas Boulevard. 

Sports and Recreational Facilities | Feb 19, 2024

Sports stadium developers sweeten projects with affordable housing to gain support

In recent years, sports stadium developers have been including affordable housing in their projects to win support from local governments and community activists.

Mixed-Use | Jan 26, 2024

Entertainment districts are no longer just about sports, dining, and music

Diversity of experiences is what makes entertainment districts tick these days. That’s one reason why offices continue to be included in district proposals. And in their efforts to emerge as year-round destinations, more districts are either including residential in their proposals or supporting existing districts with housing.

Sports and Recreational Facilities | Dec 15, 2023

San Antonio Spurs’ new practice facility aims to help players win championships and maintain well-being

Designed by ZGF, the Victory Capital Performance Center uses biophilic design to promote better health and wellness on and off the court.

Giants 400 | Oct 17, 2023

Top 70 Sports Facility Construction Firms for 2023

AECOM, Turner Construction, Clark Group, Mortenson head BD+C's ranking of the nation's largest sports facility contractors and construction management (CM) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

Giants 400 | Oct 17, 2023

Top 130 Sports Facility Architecture Firms for 2023

Populous, Gensler, HOK, and HKS head BD+C's ranking of the nation's largest sports facility architecture and architecture/engineering (AE) firms for 2023, as reported in Building Design+Construction's 2023 Giants 400 Report.

boombox1 - default
boombox2 -
native1 -

More In Category

Mixed-Use

A surging master-planned community in Utah gets its own entertainment district

Since its construction began two decades ago, Daybreak, the 4,100-acre master-planned community in South Jordan, Utah, has been a catalyst and model for regional growth. The latest addition is a 200-acre mixed-use entertainment district that will serve as a walkable and bikeable neighborhood within the community, anchored by a minor-league baseball park and a cinema/entertainment complex.


Cultural Facilities

Multipurpose sports facility will be first completed building at Obama Presidential Center

When it opens in late 2025, the Home Court will be the first completed space on the Obama Presidential Center campus in Chicago. Located on the southwest corner of the 19.3-acre Obama Presidential Center in Jackson Park, the Home Court will be the largest gathering space on the campus. Renderings recently have been released of the 45,000-sf multipurpose sports facility and events space designed by Moody Nolan.



halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021