CannonDesign manages a $2 billion hospital design review with digital processes

Sponsored Content AEC Tech

CannonDesign manages a $2 billion hospital design review with digital processes

Collectif Santé Montreal turns to Bluebeam Revu for project efficiency in establishing the largest hospital in Montreal.


By Bluebeam | May 31, 2016
CannonDesign manages a $2 billion hospital design review with digital processes

The Centre Hospitalier de l’Université de Montréal (CHUM) hospital project in Montreal, Canada. Image courtesy CannonDesign.

As the Architectural Project Delivery Leader for the new $2 billion (Canadian), 3.5 million square foot Centre Hospitalier de l’Université de Montréal (CHUM) hospital project in Montreal, Canada, Matt Forman, CannonDesign + NEUF architect(e)s knows how crucial project efficiency is to project delivery. CannonDesign and NEUF architect(e)s are the architects for Collectif Santé Montreal, the consortium which was awarded this sizeable P3 (or Public Private Partnership) project. A key objective of the consortium’s proposal was the delivery of almost 85% of the hospital functional program in the first phase—no small feat, literally, as the hospital is set to occupy two full city blocks as the largest hospital in Montreal, as well as one of the largest academic medical centers in North America. 

With more than 5,900 pages of architectural drawings to manage and deadlines looming, CannonDesign and NEUF architect(e)s turned to the use of room templates as a way of mitigating the number of floorplans required for this 14,000-room hospital. Even with the extensive use of templates, however, thousands of documents would still need to be managed. Enter PDF creation and editing solution Bluebeam Revu, which allows teams to easily markup and comment on project documents, as well as store documents as a single source of truth and track all editing activity with Revu’s integrated cloud collaboration solution, Bluebeam Studio.

Taking Design Reviews Digital

The design review process for CHUM includes three or more sets of meetings with users from each department—something which may sound reasonable at first, until one realizes there are more than 140 departments in the hospital! And with each meeting taking approximately three to four hours, this adds up to more than 1,200 hours of meetings for design review of the rooms alone. And that doesn’t even include the reviews with the rest of the consultant team. 

“Design review could have been an absolute nightmare,” shares Forman. “We decided to take this process digital by reviewing drawings with the users in Revu, saving us the time and hassle of marking them up by hand on tracing paper, then translating and typing up our notes before sending them to the rest of the architectural team.” Another motivation for going digital was the use of Revu’s Calibrate tool to confirm measurements, ensuring that the necessary medical equipment would actually fit, eliminating the back and forth communication that usually occurs. 

“We’ve estimated that it’s saved us about 2-3 weeks per review.” – Matt Forman at CannonDesign + NEUF architect(e)s.

During the design review phase with the MEP and other members of the consultant team, the architects would post all of the packages into a Studio Session, which enables real-time, document-based collaboration, and then invite the other consultants to join. Taking full advantage of this, Forman created a custom tool set—a collection of drag-and-drop icons used to markup documents—to share with the reviewers, assigning each firm a color. When team members would add markups or comments to a document in Studio, Forman could immediately see who made the changes, when they made them and who responded. 

Coordinating Complex Spaces with 3D PDFs

CannonDesign used 3D interior elevations to coordinate the project’s complex laboratory equipment layouts. Working in Revit, they used Codebook, an equipment data management tool, to add and track all of the equipment data. They would then save the file as a 3D PDF in Revu and share it with the hospital’s clinicians for review and approval of layouts. Leveraging 3D PDFs not only makes it easier to share robust BIM data in a lightweight format with partners downstream, but also enabled the clinicians to understand the layouts more easily than with a typical 2D floor plan. And because the team took the time to set up their Revit families correctly in the original drawing, all of the equipment data was carried into that 3D PDF.

Cutting Down QA/QC Timeline

CannonDesign’s previous QA/QC process used to consist of marking up paper drawings with a red pen. At this scale, that process was challenging due to the number of reviewers involved in any given set of drawings. The old method took more time, with comments trickling in over a period of several weeks. By streamlining them into a single set of markups in Revu and saving them into a Studio Session, they now have everything in one place. Additionally, comments can be easily assigned and tracked in Revu’s Markups list, a running spreadsheet-like record of document edits. Studio also proved to be especially valuable when Forman had to travel offsite. Using his iPad, Forman was able to log in to Studio Sessions through the Revu iPad app, review drawings, add his comments and keep the project on track in real time.  

“It’s taken a stunning amount of time out of our QA/QC process.” – Matt Forman at CannonDesign + NEUF architect(e)s.

No More Late Nights

After the QA/QC reviews were complete and the drawings approved by the registered architects, a secure seal and signature needed to be applied to each sheet. Instead of pulling an all-nighter to apply the seals to the sheets, the team used Revu’s Batch Apply Stamp tool, which applies a selected stamp in the same position to multiple PDFs or multiple pages of a PDF at the same time. “After spending about 30 minutes setting up the stamp alignment, it took us less than an hour to run the batch process,” explains Forman. “And now the process is repeatable. Between Revu’s nimble markup tools and having Studio as a common platform for multiple consultants to collaborate, the software really enabled and streamlined our large team workflow on this project.”

To learn more about Revu or download a free 30-day trial, please visit us here.

Tags

Related Stories

BIM and Information Technology | Mar 11, 2024

BIM at LOD400: Why Level of Development 400 matters for design and virtual construction

As construction projects grow more complex, producing a building information model at Level of Development 400 (LOD400) can accelerate schedules, increase savings, and reduce risk, writes Stephen E. Blumenbaum, PE, SE, Walter P Moore's Director of Construction Engineering.

AEC Tech | Mar 9, 2024

9 steps for implementing digital transformation in your AEC business

Regardless of a businesses size and type, digital solutions like workflow automation software, AI-based analytics, and integrations can significantly enhance efficiency, productivity, and competitiveness.

AEC Tech | Feb 28, 2024

How to harness LIDAR and BIM technology for precise building data, equipment needs

By following the Scan to Point Cloud + Point Cloud to BIM process, organizations can leverage the power of LIDAR and BIM technology at the same time. This optimizes the documentation of existing building conditions, functions, and equipment needs as a current condition and as a starting point for future physical plant expansion projects. 

AEC Innovators | Feb 28, 2024

How Suffolk Construction identifies ConTech and PropTech startups for investment, adoption 

Contractor giant Suffolk Construction has invested in 27 ConTech and PropTech companies since 2019 through its Suffolk Technologies venture capital firm. Parker Mundt, Suffolk Technologies’ Vice President–Platforms, recently spoke with Building Design+Construction about his company’s investment strategy. 

AEC Tech | Feb 20, 2024

AI for construction: What kind of tool can artificial intelligence become for AEC teams?

Avoiding the hype and gathering good data are half the battle toward making artificial intelligence tools useful for performing design, operational, and jobsite tasks.

AEC Tech | Feb 20, 2024

ABC releases technology guide for AI in construction

Associated Builders and Contractors has released an artificial intelligence (AI) technology guide for the U.S. construction industry. AI in Construction — What Does It Mean for Our Contractors? outlines definitions, construction use cases, and considerations for the implementation of AI in construction.  

AEC Tech | Jan 24, 2024

4 ways AEC firms can benefit from digital transformation

While going digital might seem like a playground solely for industry giants, the truth is that any company can benefit from the power of technology.

Modular Building | Jan 19, 2024

Building with shipping containers not as eco-friendly as it seems

With millions of shipping containers lying empty at ports around the world, it may seem like repurposing them to construct buildings would be a clear environmental winner. The reality of building with shipping containers is complicated, though, and in many cases isn’t a net-positive for the environment, critics charge, according to a report by NPR's Chloe Veltman.

AEC Tech | Jan 8, 2024

What's driving the surge of digital transformation in AEC today?

For centuries, the AEC industry has clung to traditional methods and legacy processes—seated patterns that have bred resistance to change. This has made the adoption of new technologies a slow and hesitant process.

Sustainability | Nov 1, 2023

Researchers create building air leakage detection system using a camera in real time

Researchers at the U.S. Department of Energy’s Oak Ridge National Laboratory have developed a system that uses a camera to detect air leakage from buildings in real time.

boombox1 - default
boombox2 -
native1 -

More In Category




halfpage1 -

Most Popular Content

  1. 2021 Giants 400 Report
  2. Top 150 Architecture Firms for 2019
  3. 13 projects that represent the future of affordable housing
  4. Sagrada Familia completion date pushed back due to coronavirus
  5. Top 160 Architecture Firms 2021